Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 1033 - 1044 of 1669
Notice of Intent

Standard for Alarm Valves for Fire-Protection...

1.1 These requirements cover alarm valves for use in automatic wet-pipe sprinkler systems for fire-protection service. Alarm valves covered by these requirements are of either the variable- or constant-pressure type and are...
Notice of Intent

Standard for Transients Test Method

Note: The title, ICS code, scope & project need of this Notice of Intent (originally published on November 16, 2021) were updated by the responsible SDO on October 22, 2024. These requirements cover the transients test method...
Article

Bridging innovation and trust: SCC's blueprint...

Joint statement by SCC’s Chantal Guay, CEO and Elias Rafoul, VP Accreditation Services for World Accreditation Day 2024. As we celebrate World Accreditation Day 2024 with the theme ‘Accreditation: Empowering Tomorrow and...
Notice of Intent

Energy Storage Systems and Equipment

1 Scope 1.1 These requirements cover energy storage systems that are intended to receive electric energy and then to store the energy in some form so that the energy storage system can provide electrical energy to loads or to...
Notice of Intent

Component Tapes

Note: The scope for this NOI (originally published on March 8, 2022) was updated by the responsible SDO on November 16, 2022. 1 Scope 1.1 This standard covers tape having constructional features such as reinforcement...
Notice of Intent

Energy Storage Systems and Equipment

1 Scope 1.1 These requirements cover energy storage systems that are intended to store energy from power or other sources and provide electrical or other types of energy to loads or power conversion equipment. The energy...
Notice of Intent

Standard for Safety for Power Banks

Note: The title and scope of this Notice of Intent (originally published on March 26, 2019) was updated by the responsible SDO on July 16, 2024. These requirements cover power banks, sometimes also known as portable USB...
Notice of Intent

Safety requirements for electrical equipment ...

Scope: This IEC second edition cancels and replaces the first edition published in 2012. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the...
Notice of Intent

Standard for Safety for Service, Communication...

These requirements cover the safety of the robotic function of Service, Communication, Information, Entertainment and Education (SCIEE) robots. These requirements supplement the safety requirements for the intended, non...
Notice of Intent

Standard for Automated Mobile Platforms (AMPs...

Note: Title and scope updated June 9, 2020. 1 Scope 1.1 These requirements cover battery-operated mobile platforms with or without a payload, as specified in 1.2 . These devices are intended to be used indoors only or as...
Notice of Intent

Relocatable Structures

1.1 This standard provides the requirements for modular built relocatable temporary structures. 1.2 Relocatable structures for temporary use are a form of modular construction, built in an approved offsite facility, designed...