Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 2209 - 2220 of 11648
Notice of Intent

Control units for fire alarm systems

This Standard covers requirements for control units, fire alarm systems and control unit accessories for use in accordance with CAN/ULC‑S524, Standard for the Installation of Fire Alarm Systems, in accordance with Rule 32‑004...
Notice of Intent

Residential fueling appliances (RFA)

1.1 General This Standard details mechanical, physical, and electrical requirements for a newly manufactured appliance that compresses natural gas for vehicles and dispenses directly into a) the vehicle natural gas fuel...
Notice of Intent

Fenestration energy performance / User guide ...

1.1 This Standard applies to (a) fenestration systems covered by AAMA/WDMA/CSA 101/I.S.2/A440, including (i) vertically sliding windows; (ii) horizontally sliding windows; iii) dual-action windows; (iv) casement windows, both...
Notice of Intent

Vehicle-mounted aerial devices

1.1 Purpose The purpose of this Standard is to establish criteria for the design, manufacture, testing, inspection, installation, maintenance, use, and operation of vehicle-mounted aerial devices installed on a chassis...
Notice of Intent

Direct Gas-Fired Process Air Heaters

1.1 This Standard applies to newly produced, direct gas-fired process air heaters of the recirculating or nonrecirculating type (see Clause 3, Definitions), hereinafter referred to as heaters, whose primary purpose is to...
Notice of Intent

Compressed natural gas (CNG) fuel storage and...

Note: The standard designation and scope for this NOI (originally published on April 13, 2023) were updated by the responsible SDO on February 27, 2024. 1.1 Applicability This Standard applies to the design, installation...