Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 11485 - 11496 of 12085
Notice of Intent

Compressed Gas Regulators

1 Scope 1.1 These minimum requirements cover regulators used to reduce the pressure of compressed industrial gases from a source or storage cylinder pressure of not more than 5500 psig (37.91 MPa) to the use pressure. 1.2...
Notice of Intent

Acoustics in the Built Environment

Note: This NOI replaces ASC's NOI for CAN-ASC-2.5/ICC A118: Acoustics in the Built Environment (https://www.scc.ca/en/standards/notices-of-intent/asc/can-asc-25-icc-a118-acoustics-built-environment). The purpose of standard...
Notice of Intent

Controllers for Use in Power Production

1.1 These requirements apply to control panels, control units, and other various electrical circuits employed within a control circuit device intended for support functions, maintain operation and limiting safety control...
Notice of Intent

LP-Gas, Natural Gas, and Manufactured Gas Devices...

1 Scope 1.1 This standard sets forth minimum requirements for the following types of devices for engine fuel system applications intended for use with liquefied petroleum gas (LP-Gas), natural gas, and/or manufactured gas. a)...
Notice of Intent

Fuel system components for compressed natural...

1.1 This Standard establishes requirements for newly produced compressed natural gas fuel system components, intended for use on natural gas powered vehicles, as listed in Table 1 below. Table 1 - Fuel system components -...
Notice of Intent

Standard for Safety for Service, Communication...

This document establishes the safety requirements for Service, Communication, Information, Education and Entertainment (SCIEE) robots. These requirements supplement the safety requirements for the intended, non-robotic...
Notice of Intent

FUEL CELL and Water Electrolysis Technologies...

Note: The scope of this Notice of Intent (originally published on January 31, 2023) was updated by the responsible SDO on November 13, 2024. Note: The title, standard designation number and scope for this NOI (originally...
Notice of Intent

Gas-fired central furnaces

1.1 This Standard applies to automatically operating gas-fired central furnaces (see Clause 3), hereinafter referred to as furnaces, for installation in residential, commercial, and industrial structures including furnaces...