Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 5641 - 5652 of 9097
Notice of Intent

Power conversion equipment

1.1 This Standard applies to ac and dc type power conversion equipment (PCE) that a) is of dry or liquid-filled construction; b) has a rated voltage not exceeding 1500 V; and c) is for commercial, industrial, and residential...
Notice of Intent

Fuseholder – Part 8: Class J

1.1 This Part is intended to be read together with the Standard for Fuseholders – Part 1: General Requirements, hereafter referred to as Part 1. The titles of the Clauses in this Part correspond to the similarly titled...
Notice of Intent

Medical electrical equipment - Part 1-6: General...

This International Standard specifies a PROCESS for a MANUFACTURER to analyse, specify, design, VERIFY and VALIDATE USABILITY, as it relates to BASIC SAFETY and ESSENTIAL PERFORMANCE of MEDICAL ELECTRICAL EQUIPMENT, hereafter...
Notice of Intent

Medical electrical equipment - Part 1-11: General...

Scope This International Standard applies to the BASIC SAFETY and ESSENTIAL PERFORMANCE of MEDICAL ELECTRICAL EQUIPMENT and MEDICAL ELECTRICAL SYSTEMS, hereafter referred to as ME EQUIPMENT and ME SYSTEMS, which are intended...
Notice of Intent

Secondary cells and batteries containing alkaline...

This part of IEC 62133 specifies requirements and tests for the safe operation of portable sealed secondary nickel cells and batteries containing alkaline electrolyte, under intended use and reasonably foreseeable misuse. 1DV...
Notice of Intent

Steel flanges

Note: This notice of intent was withdrawn by the responsible SDO on October 31, 2023. This Standard covers wrought steel welding neck and blind flanges primarily intended for use in pipeline systems carrying oil, gas...
Notice of Intent

Safety requirements for electrical equipment ...

This IEC fourth edition cancels and replaces the third edition published in 2016. This edition constitutes a technical revision. Replacement: • This Part 2 is applicable to electrically powered LABORATORY CENTRIFUGES. NOTE...
Notice of Intent

Standard for Heat Actuated Fire Detectors for...

These requirements cover heat actuated fire detectors in ordinary (nonhazardous) and outdoor locations, for use as components in automatic fire protective systems, to be installed in accordance with the Standard for the...
Notice of Intent

Portable Power Cables

1.1 This Standard specifies construction and testing requirements for portable power cables normally used in applications where the cables are subject to frequent flexing and where installation is in accordance with CSA M421...
Notice of Intent

Information Technology - Telecommunications and...

This International Standard specifies the signalling protocol for the support of the Private User Mobility call handling additional network features (ANF-PUMI and ANF-PUMO) at the Q reference point between Private Integrated...