Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 5245 - 5256 of 9097
Notice of Intent

Neutral grounding devices

1.1 This Standard applies to assemblies of resistors, enclosures, and other components that provide high impedance grounding for the purpose of controlling the ground fault current or the voltage to ground of an alternating...
Notice of Intent

Identification cards - Test methods - Part 6...

ISO/IEC 10373 defines test methods for characteristics of identification cards according to the definition given in ISO/IEC 7810. Each test method is cross-referenced to one or more base standards, which can be ISO/IEC 7810...
Notice of Intent

Electromagnetic compatibility (EMC) - Part 4-...

This part of IEC 61000 relates to the immunity requirements and test methods for electrical and electronic equipment, under operational conditions, to non-repetitive damped oscillatory transients (ring waves) occurring in low...
Identification cards - Test methods - Part 7: Vicinity cards
ISO/IEC 10373 defines test methods for characteristics of identification cards according to the definition given in ISO/IEC 7810. Each test method is cross-referenced to one or more base standards, which may be ISO/IEC 7810...
Notice of Intent

Identification cards - Test methods - Part 6: ...

ISO/IEC 10373 defines test methods for characteristics of identification cards according to the definition given in ISO/IEC 7810. Each test method is cross-referenced to one or more base standards, which can be ISO/IEC 7810...
Notice of Intent

Durability in buildings

1.1 This Standard provides criteria and requirements for the design of a durable building and its building elements and includes provisions for cost analysis and management and for a quality management program for the design...
Notice of Intent

Greenhouse Gases - Part 1: Specification with...

This document specifies principles and requirements and provides guidance at the project level for the quantification, monitoring and reporting of activities intended to cause greenhouse gas (GHG) emission reductions or...
Notice of Intent

Greenhouse gases — Part 2: Specification with...

This document specifies principles and requirements and provides guidance at the project level for the quantification, monitoring and reporting of activities intended to cause greenhouse gas (GHG) emission reductions or...
Notice of Intent

Greenhouse gases — Part 3: Specification with...

This document specifies principles and requirements and provides guidance at the project level for the quantification, monitoring and reporting of activities intended to cause greenhouse gas (GHG) emission reductions or...
Notice of Intent

Electromagnetic Compatibility (EMC) - Part 4-...

This part of IEC 61000 defines test methods for immunity to ripple at the d.c. input power port of electrical or electronic equipment. This Standard is applicable to low-voltage d.c. power ports of equipment supplied by...
Notice of Intent

Information Technology - Telecommunications and...

This International Standard specifies the signalling protocol for the support of the Call Priority Interruption (SS-CPI) and Call Priority Interruption Protection (SS-CPIP) supplementary services at the Q reference point...