Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 493 - 504 of 9226
Notice of Intent

Standard for Suspended Ceiling Grid Low Voltage...

These requirements cover suspended ceiling grid low voltage system is intended to be permanently connected, for indoor dry locations, and installed in accordance with the following requirements: Canadian Electrical Code, Part...
Notice of Intent

Standard For 650 °C Factory- Built Chimneys

Note: The scope for this NOI (originally published on March 16, 2021) was updated by the responsible SDO on July 27, 2021. 1.1 These requirements apply to factory-built chimney assemblies which do not require field...
Notice of Intent

Standard for Safety for Household and Similar...

This clause of Part 1 is replaced by the following. This Standard deals with the safety of electrically powered pool lifts intended for persons requiring assistance for safe entry into and out of a pool, their RATED VOLTAGE...
Notice of Intent

Standard for Refurbishing of Storage Tanks for...

Note: The standards development activity was updated to "new edition" by the responsible SDO on June 24, 2020. 1 SCOPE 1.1 This Standard covers the refurbishing of shop fabricated tanks built to nationally recognized...
Notice of Intent

Standard for Rating and Fire Testing of Fire ...

1 Scope 1.1 These requirements cover rating, and performance during fire tests, of fire extinguishers intended for use in attacking Class A, B, C, D, and K fires as defined herein. These requirements also cover performance...
Notice of Intent

Standard for Smoke Alarms

1.1 These requirements cover electrically operated single and multiple station smoke alarms intended for open area protection in indoor locations and portable smoke alarms used as "travel" alarms in accordance with: a)...
Notice of Intent

Standard for Power-Operated LP-Gas Dispensing...

Note: The title and scope for this NOI (originally published January 19, 2021) was updated by the responsible SDO on January 5, 2022 1.1 These requirements cover power-operated dispensing devices intended to be installed...