Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 5377 - 5388 of 12071
Notice of Intent

Quality management -- Customer satisfaction -- ...

This International Standard provides guidance on the process of complaints handling related to products within an organization, including planning, design, operation, maintenance and improvement. The complaints handling...
Notice of Intent

Incandescent Lamps

1.1 This Standard applies to medium-screwbase incandescent lamps, including double-envelope tungsten halogen types, that have right-hand threads and are intended for general lighting use in luminaires and other lighting...
Notice of Intent

Equipment For Use With Electric Discharge Lamps

Part 1 - Ballasts for Use with Fluorescent Lamps 1.1 These requirements apply to ballasts of the resistance, reactance, and electronic (solid state) types for use with fluorescent lamps, involving potentials of 2500 V to...
Notice of Intent

Overhead aluminum secondary and service-entrance...

1.1 This Standard specifies requirements for overhead secondary and service-entrance cables and conductors intended primarily for operation by electrical utilities. Note: The operation of cables and conductors complying with...
Notice of Intent

Selection, use and care of respirators

1.1 - This Standard sets out requirements for the selection, use, and care of respirators and for the administration of an effective respiratory protection program in the workplace. 1.2 - This Standard is not intended to...
Notice of Intent

UN pressure receptacles and multiple-element ...

1.1 This Standard specifies requirements for the design, construction, initial inspection and testing, marking, periodic inspection and testing, and repair of UN pressure receptacles and multiple-element gas containers (MEGCs...
Notice of Intent

Testing Method for Measuring Energy Consumption...

1.1 This Standard describes the test procedures required to perform a 24 h simulated use test. This Standard also provides the calculations required to determine the first-hour rating, recovery efficiency, standby loss, daily...
Notice of Intent

Requirements for the support power systems of...

1.1 This Standard covers the design, procurement, qualification, construction, installation, inspection, and documentation of CANDU nuclear power plant electrical power and instrument air systems. These systems are considered...