Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 2077 - 2088 of 11720
Medical electrical equipment - Part 2-31: Particular requirements for the basic safety and essential performance of external cardiac pacemakers with internal power source (Adopted IEC 60601-2-31:2008, second edition, 2008-03)
Notice of Intent

Sustainable Management

This standard includes attributes, criteria and metrics that will be used to assess the sustainable management practices and performance of manufacturers, as well as component and material suppliers, that are seeking to...
Notice of Intent

Product Sustainability for Activated Carbon

The following attributes, criteria and metrics will be used to assess the sustainability of activated carbon throughout its entire life cycle, including: feedstock, activated carbon production, distribution, and end-of-life...
Notice of Intent

Standard for Automobile Fire Fighting Apparatus

This Standard defines the minimum performance requirements for new automobile fire fighting apparatus such as pumpers, water tank trucks, ladder trucks, aerial devices and combinations of these, as used for structural fire...
Notice of Intent

Standard for Fusible Links for Fire Protection...

These requirements cover fusible links used for fire-protection service. Fusible links are classified by temperature rating, type of coating or plating, minimum and maximum design load, and other factors which may have a...
Notice of Intent

Safety code for suspended platforms

This Standard specifies requirements for the design, construction, installation, inspection, testing, maintenance, alteration, and repair of suspended platforms
Notice of Intent

Standard for Antifreeze Solutions for Use in ...

This Standard covers requirements for the performance of antifreeze solutions for fire sprinkler systems. These solutions are intended for use in wet pipe sprinkler systems subject to freezing for installation in accordance...