Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 1669 - 1680 of 12061
Notice of Intent

Transfer Switch Equipment, Meter Mounted

These requirements cover automatic and non-automatic (manual) transfer switch equipment, operating at 600 V ac or less, intended either for installation in a utility meter base or fabricated as part of a utility meter base...
Notice of Intent

Standard for Single and Multiple Station Heat...

The Standard will cover heat-actuated, single and multiple station heat alarms intended for indoor and unconditioned space installation as recommended in the end product installation instructions and in accordance with the...
Notice of Intent

Flame Detectors

The requirements cover the design, construction and performance of flame detectors rated at 300 V or less intended to be used in combination with other appliances and devices to form a life safety system.
Notice of Intent

Standard for Components for Personal Flotation...

These requirements cover components intended for use in the manufacturer of personal flotation devices. Compliance with these requirements does not indicate that the product is intended for use as a component of an end...
Notice of Intent

Individual Office Furnishings

These requirements cover the evaluation of individual commercial office furnishings in large offices that are not connected to or part of a panel systems. These furnishings may include, but not limited to: bench systems...
Notice of Intent

Burglary Resisting Glazing Material

1.1 These requirements cover clear or translucent glazing material intended for indoor use, outdoor use, or indoor/outdoor use as a substitute for, or in combination with plate glass show window panels. 1.2 The material is...
Notice of Intent

Delayed-Action Timelocks 

1.1 These requirements cover delayed-action timelocks intended for attachment on the doors of chests, and the like, to provide a means for delaying unlocking for a predetirmined length of time as protection against robbery. 1...
Notice of Intent

Standard for Heat Shields

These requirements cover the construction and performance of heat shields for vertical installation between heat producing appliances, chimney connectors and combustible construction.