Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 1129 - 1140 of 8694
Notice of Intent

Thermoplastic insulated wires and cables

1.1 This Standard specifies the requirements for 600 V, single-conductor, thermoplastic-insulated wires and cables, for use as follows: a) In Canada, in accordance with CSA C22.1, Canadian Electrical Code (CEC), Part I; b) In...
Notice of Intent

Communications cables

1.1 This Standard applies to 60 - 250°C single- or multiple-conductor jacketed or unjacketed, integral or nonintegral cables and single or multiple coaxial cables for telephone and other communication circuits such as voice...
Notice of Intent

Communications cables

1.1 This standard applies to 60 – 250°C single- or multiple-conductor jacketed or unjacketed, integral or nonintegral cables and single or multiple coaxial cables for telephone and other communication circuits such as voice...
Notice of Intent

Fuseholders - Part 1: General Requirements

1.1.1 These fuseholders and devices accommodate fuses to be employed in electrical circuits and are intended to be used in accordance with the Canadian Electrical Code, Part I (CE Code Part I), CSA C22.1, the National...
Notice of Intent

Fuseholders - Part 1: General Requirements

.1.1 These fuseholders and devices accommodate fuses to be employed in electrical circuits and are intended to be used in accordance with the Canadian Electrical Code, Part I (CE Code Part I), CSA C22.1, the National...
Notice of Intent

Household dishwashers

1.1 This Standard applies to electric household dishwashers intended to be used in nonhazardous locations in accordance with the Canadian Electrical Code (CEC), Part I, C22.1, General Requirements %u2013 Canadian Electrical...
Notice of Intent

Standard for Stationary Engine Generator Assemblies

Note: Designation Number, Standard Type and Scope updated March 27, 2018 as per a request from the responsible SDO. (NOI originally published to CNS on September 1, 2015) Note: The revised scope was withdrawn on June 5, 2018...