Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 1249 - 1260 of 8894
Notice of Intent

Standard for Aboveground Steel Tanks for Fuel...

1.1 This Standard covers the design and construction of aboveground steel non-pressure tanks intended for installation inside or outside buildings and for the storage of: A Combustible liquid intended to be used as heating...
Notice of Intent

Large Ferrules

1.1 These requirements include bare and covered ferrules intended for field wiring and factory wiring for use in accordance with the National Electrical Code and ANSI/NFPA- 70 and Canadian Electrical Code (CEC), Part I, CSA...
Notice of Intent

AMENDMENT 1 - Information technology - Keyboard...

Within the general scope described in ISO/IEC 9995-1, this part of ISO 9995 defines the allocation on a keyboard of a set of graphic characters which, when used in combination with an existing national version keyboard layout...
Notice of Intent

Information technology - Keyboard layouts for...

Within the general scope described in ISO/IEC 9995-1, ISO 9995-9:2016 defines the allocation on a keyboard of a set of graphic characters which, when used in combination with an existing national version keyboard layout...
Notice of Intent

Information technology - Keyboard layouts for...

Within the general scope described in ISO/IEC 9995-1, this part of ISO 9995 defines the allocation on a keyboard of a set of graphic characters which, when used in combination with an existing national version keyboard layout...
Notice of Intent

Hardware for the support of conduit, tubing, ...

1.1 These requirements cover hardware for the support of conduit, tubing, and cable, such as HANGERS, STAPLES, STRAPS, and similar devices for installation in accordance with the National Electrical Code, NFPA 70, and the...
Notice of Intent

Uninterruptible power systems

1 General Replace this clause of the RD with the following: 1.1.1 Equipment covered by this Standard This Standard applies to UNINTERRUPTIBLE POWER SYSTEMS (UPS). The primary function of the UPS for this Standard is to ensure...
Notice of Intent

Standard for Method of Fire Test of Fire Damper...

1.1 These requirements and methods of test apply to fire damper assemblies rated ¾ h, 1 h, 1½ h, 2 h, or 3 h for use in air-conditioning and ventilating system ducts or openings (without ducts) piercing horizontally or...
Notice of Intent

Non-Metallic Dip Tubes for Use in Water Heaters

1.1 This Standard applies to newly produced non-metallic dip tubes intended for use in water heaters. 1.2 Compliance of a dip tube with this Standard does not imply that such dip tube is acceptable for use in water heaters...
Notice of Intent

Burglary Resistant Vault Doors and Modular Panels

1.1 These requirements cover vault doors and vault modular panels (for use in the construction of vault floors, walls and ceilings), of the type intended for use in financial institutions, commercial, industrial and...
Notice of Intent

Standard For 650 °C Factory- Built Chimneys

Note: The scope for this NOI (originally published on March 16, 2021) was updated by the responsible SDO on July 27, 2021. 1.1 These requirements apply to factory-built chimney assemblies which do not require field...