Search

Refine Results
Type
Program
Status
Country
Province
City
Program Specialty Area
Field of Testing
Period range

From

To

Displaying 7933 - 7944 of 9886
Notice of Intent

Standard for Site Quality Assurance Program for...

This standard outlines the requirements for a site quality assurance program (SQAP) for the on-site installation of spray applied polyurethane foam (SPF). As the installation of the material is dependent on the installer, a...
Notice of Intent

Compressed Gas Regulators

1.1 These minimum requirements cover regulators used to reduce the pressure of compressed industrial gases from a source or storage cylinder pressure of not more than 5500 psig (37.91 MPa) to the use pressure. 1.2 Regulators...
Notice of Intent

Water Based Agent Fire Extinguishers

These requirements cover the construction and performance, exclusive of performance during fire tests, of portable water based agent fire extinguishers. These fire extinguishers are intended to be utilized in accordance with...
Notice of Intent

Standard for Mineral Fibre Thermal Insulation...

1.1 This Standard specifies the requirements for installation of mineral fibre thermal insulation products for buildings such that, when installed, a product manufactured and packaged according to CAN/ULC-S702 will provide...
Notice of Intent

Safety requirements for electrical equipment ...

This clause of Part 1 is applicable except as follows: 1.1.1 Equipment included in scope Replacement: This part of IEC 61010 specifies safety requirements for electrically powered laboratory equipment for the heating of...
Notice of Intent

Antimicrobial Stewardship Program

Note: The ICS code for this NOI wasupdated by the responsible SDO on April 23, 2024. HSO has decided to convene a standards Technical Committee to revise the current safety intervention standard for Antimicrobial Stewardship...
Notice of Intent

Health Care Facility Digital Infrastructure

Note: The standard designation number for this NOI (originally published on July 16, 2019), was updated by the responsible SDO on July 13, 2021. Note: The title and scope for this NOI (originally published July 16, 2019) was...
Notice of Intent

Standard for Thermal Insulation -Spray Applied...

1.1 This Standard outlines requirements for the installation of spray applied rigid polyurethane foam, medium density. The material can be installed as thermal insulation, air barrier, vapour barrier or any combination of...
Notice of Intent

Standard for Air Barrier Assemblies - Specification

1.1 This standard sets out criteria for specification of air barrier assemblies that may be used in design specification documents or in manufacturer’s product literature. 1.2 This standard provides the requirements and test...
Notice of Intent

Explosive atmospheres – Part 40: Requirements...

This document provides specific requirements for process sealing between a flammable process fluid and an electrical system where a failure could allow the migration of the process fluid directly into the premises wiring...