Search

Refine Results
Type
Status
Period range

From

To

Displaying 25 - 29 of 29
Notice of Intent

FUEL CELL and Water Electrolysis Technologies...

Note: The scope of this Notice of Intent (originally published on January 31, 2023) was updated by the responsible SDO on November 13, 2024. Note: The title, standard designation number and scope for this NOI (originally...
Notice of Intent

Supplement #1 to CSA F379 Series-09, Packaged...

1.1 This Standard applies to the performance, durability, and safety of packaged solar domestic hot water (SDHW) systems that use liquid-to-liquid heat transfer and liquid heat storage media suitable for year-round use. 1.2...
Notice of Intent

Standard for Safety for Energy Storage Systems...

Note: The scope for this NOI (originally published on July 6, 2021) was updated by the responsible SDO on August 23, 2022. 1.1 These requirements cover an energy storage system (ESS) that is intended to receive and store...
Notice of Intent

Standard for Containment Sumps, Fittings and ...

Note: The scope for this NOI (originally published on September 21, 2021) was updated by the responsible SDO on May 25, 2022. 1.1 This Standard sets forth the minimum requirements for containment sumps, and associated sump...