Search

Refine Results
Type
Program
Status
Country
Province
City
Program Specialty Area
Field of Testing
Period range

From

To

Displaying 337 - 348 of 548
Notice of Intent

Road vehicles - Liquefied natural gas (LNG) fuel...

Note: The scope for this NOI (originally published on March 15, 2022) was updated by the responsible SDO on April 21, 2022. This document specifies tests and requirements for the rigid fuel line in copper and its alloys, a...
Notice of Intent

CAN-ASC-3.1 – Plain Language

Note: The ICS Codes for this NOI (originally published on December 13, 2022) was updated by the responsible SDO on June 27, 2023. The purpose of CAN-ASC-3.1 is to develop a standard that goes above mandatory minimum technical...
Notice of Intent

Safety requirements for electrical equipment ...

Scope: This IEC second edition cancels and replaces the first edition published in 2012. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the...
Notice of Intent

Standard for Installation of Fire Alarm Systems

1.1 This Standard describes the requirements for the design and installation of a fire alarm system with or without voice communication capability. NOTE 1: This Standard is intended to apply to both required and voluntary...
Notice of Intent

Battery Circularity Standard

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of February 6 to February 27, 2024 (originally...
Notice of Intent

Performance Standard for Rating Large and Single...

.1 The purpose of this Standard is to establish the following for large and single packaged vertical air conditioners and heat pumps: (a) definitions; (b) classifications; (c) test requirements; (d) rating requirements; (e)...
Notice of Intent

Standard for Safety for Fuel Tank Accessories...

Note: The title and scope for this NOI was updated by the responsible SDO on March2 ,2021 (originally published July 14, 2020) 1.1 These requirements cover mechanical type accessories that are typically intended for...
Notice of Intent

Bare and covered ferrules

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of August 22 to September 13, 2023 (originally...
Notice of Intent

Electric Vehicle Infrastructure Deployment Guideline

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of February 6 to February 27, 2024 (originally...
Notice of Intent

Watershed-based flood and erosion management ...

Note: The title and scope for this NOI (originally published on May 30, 2023) was updated by the responsible SDO on March 19, 2024. Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the...