Search

Refine Results
Type
Status
Period range

From

To

Displaying 373 - 384 of 438
Notice of Intent

Standard for Safety for Energy Storage Systems...

1 Scope 1.1 These requirements cover an energy storage system (ESS) that is intended to receive and store energy in some form so that the ESS can provide electrical energy to loads or to the local/area electric power system...
Notice of Intent

Information technology - Cloud computing - Cloud...

There is no scope Document Description - enables disparate applications to create and share visibility event data, both within and across enterprises. Introduction This document is a GS1 standard that defines Version 1.2 of...
Notice of Intent

A Guide to Public Involvement

1. Introduction This Guide will help you determine whether or not to involve the public in making a decision or dealing with an issue in which both you and it have an interest. If, after reviewing the first section, you...
Notice of Intent

Flexible Metallic Hose

1 Scope 1.1 These requirements cover flexible metallic hose supplied with fittings on each end that facilitate connection without twisting the hose. They have a corrugated metal core or a nonmetallic inner core which are...